projects

Project Report – Cable section to replace 11Kv overhead line near ponds. GINP

Written by on April 23, 2012 in projects with 0 Comments
Project Report – Cable section to replace 11Kv overhead line near ponds. GINP

GOOLE, BEAL, INGS LANE – Cable section to replace 11Kv overhead line near ponds. GINP Scheme Note – YP06946 The existing 11kV overhead line near Ings Lane Beal PMAR  S/S 8711 crosses a section of pond. The position of the line does not provide the necessary safety clearances where the line crosses the pond. A […]

Continue Reading

Project Report – S/S Replacement

Written by on April 23, 2012 in projects with 0 Comments
Project Report – S/S Replacement

Bradford, Cleckheaton, Garnetts 1088 – S/S Replacement Scheme Note – YP03465 Garnets 1088 s/stn is situated within the building of Wharfe Works, Stone St, Cleckheaton, Bradford. The s/sstn feeds the works complex via 4x lv single core cables which terminate in the adjacent customer’s sw room and a small lv o/h network via 2x 2c. […]

Continue Reading

Project Report – Rebuild LV OHL with ABC. ESQCR

Written by on April 23, 2012 in projects with 0 Comments
Project Report – Rebuild LV OHL with ABC. ESQCR

Leeds, Brandon, Brandon Crescent – Rebuild LV OHL with ABC. ESQCR Scheme Note – YP07964 This work has been identified to be carried out under: – WP14/02 – Replace LV OH with ABC. 2009 Programme with medium priority. WP14/07 – LV OHL Clearance to Buildings. Location Brandon Crescent Leeds. Access from Shadwell Village. Ground condition. […]

Continue Reading

Project Report – Divert and U/G section of 11kV O/H Line

Written by on April 23, 2012 in projects with 0 Comments
Project Report – Divert and U/G section of 11kV O/H Line

Scheme Title: Tadcaster, Toulston, Toulston Lodge 1137 – ESQCR (Divert and U/G section of 11kV O/H Line) Scheme Description: An inspection of 11kV o/h line A0299, found there were safety clearance issues with the proximity of conductors and structures to buildings that contravened those recommended in the current ESQCR Regulations. Overhead line A0299, a 3x.1 […]

Continue Reading

Top